List the projects a team holds a role on
const url = 'https://example.com/v1/teams/example/project-grants?limit=25';const options = {method: 'GET', headers: {Authorization: 'Bearer <token>'}};
try { const response = await fetch(url, options); const data = await response.json(); console.log(data);} catch (error) { console.error(error);}curl --request GET \ --url 'https://example.com/v1/teams/example/project-grants?limit=25' \ --header 'Authorization: Bearer <token>'For the team’s admins (and tenant admins). Each grant names its team and project.
Authorizations
Section titled “Authorizations”Parameters
Section titled “Parameters”Path Parameters
Section titled “Path Parameters”TeamId — opaque branded string.
Query Parameters
Section titled “Query Parameters”1..100. Default 25.
Where the previous page ended: its nextCursor, as it came. A runtime that seals cursors takes one only for the same list, filters and caller, within a day; otherwise 400 bad-input, and the list starts again without it. Absent → first page.
Responses
Section titled “Responses”Page of team grants.
object
A team’s role on a project.
object
A team’s role on a project, held by every member of the team: admin includes editor, which includes viewer. A team never owns a project.
When the team was given the role. Absent from a runtime that does not record it, or for a grant from before 0.1.6.
Example
{ "data": [ { "role": "viewer" } ]}Missing / malformed / expired / revoked bearer token.
object
object
Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).
Optional, kind-specific.
object
Server-assigned request id; also echoed via X-Request-Id header.
Examplegenerated
{ "error": { "code": "example", "message": "example", "details": {}, "requestId": "example" }}No team with that id under this tenant.
object
object
Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).
Optional, kind-specific.
object
Server-assigned request id; also echoed via X-Request-Id header.
Examplegenerated
{ "error": { "code": "example", "message": "example", "details": {}, "requestId": "example" }}The database was too busy to answer in time (database-busy); Retry-After (whole seconds) says when to try again.
object
object
Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).
Optional, kind-specific.
object
Server-assigned request id; also echoed via X-Request-Id header.
Examplegenerated
{ "error": { "code": "example", "message": "example", "details": {}, "requestId": "example" }}