Skip to content

List the projects a team holds a role on

View as Markdown
GET
/v1/teams/{teamId}/project-grants
curl --request GET \
--url 'https://example.com/v1/teams/example/project-grants?limit=25' \
--header 'Authorization: Bearer <token>'

For the team’s admins (and tenant admins). Each grant names its team and project.

teamId
required
string

TeamId — opaque branded string.

limit
integer
default: 25 >= 1 <= 100

1..100. Default 25.

cursor
string

Where the previous page ended: its nextCursor, as it came. A runtime that seals cursors takes one only for the same list, filters and caller, within a day; otherwise 400 bad-input, and the list starts again without it. Absent → first page.

Page of team grants.

Media typeapplication/json
object
data
required
Array<object>

A team’s role on a project.

object
teamId
required
string
projectId
required
string
role
required

A team’s role on a project, held by every member of the team: admin includes editor, which includes runner, which includes viewer. A team never owns a project.

string
Allowed values: viewer runner editor admin
grantedAt

When the team was given the role. Absent from a runtime that does not record it, or for a grant from before 0.1.6.

string format: date-time
teamName
string
projectName
string
hasMore
required
boolean
nextCursor
string
Example
{
"data": [
{
"role": "viewer"
}
]
}

Missing / malformed / expired / revoked bearer token.

Media typeapplication/json
object
error
required
object
code
required

Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).

string
message
required
string
details

Optional, kind-specific.

object
key
additional properties
any
requestId
required

Server-assigned request id; also echoed via X-Request-Id header.

string
Examplegenerated
{
"error": {
"code": "example",
"message": "example",
"details": {},
"requestId": "example"
}
}

No team with that id under this workspace.

Media typeapplication/json
object
error
required
object
code
required

Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).

string
message
required
string
details

Optional, kind-specific.

object
key
additional properties
any
requestId
required

Server-assigned request id; also echoed via X-Request-Id header.

string
Examplegenerated
{
"error": {
"code": "example",
"message": "example",
"details": {},
"requestId": "example"
}
}

The database was too busy to answer in time (database-busy); Retry-After (whole seconds) says when to try again.

Media typeapplication/json
object
error
required
object
code
required

Stable machine-readable discriminant. Values match domain error codes (see docs/API-ROUTE-CONVENTIONS.md §4.3).

string
message
required
string
details

Optional, kind-specific.

object
key
additional properties
any
requestId
required

Server-assigned request id; also echoed via X-Request-Id header.

string
Examplegenerated
{
"error": {
"code": "example",
"message": "example",
"details": {},
"requestId": "example"
}
}

See also